Fort Bliss, Texas
SLA designed a new states-side Division Headquarters. Total renovation area included 253,770 square feet. Meeting the U.S. Army Command and Control Facilities (C2F) Guidelines in a historically significant cold-war era building presented significant design problems. The solution required complete renovation of the building interior along with infrastructure upgrades for mechanical, electrical, plumbing, fire protection, security, and communication systems. The building structure renovation incorporated Anti-terrorism / Force Protection (AT/FP) techniques. Specialized coordination was necessary between DOIM and ISEC to provide secured and non-secured communications (SIPR/NIPR).